← Back to map

Green Springs

Jackson County, Oregon · EIA plant ID 6403 · Operator: U S Bureau of Reclamation
HydroConventional HydroelectricBA: BPAT
Nameplate17MWSummer 17 MW
Generators1in service
Net generation34GWh12 mo to Dec 2025
Capacity factor23%hydro units, summer MW
Heat rate—thermal plants only
First online1960

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-202468GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202522.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200173.548.8%—
200259.339.3%—
200355.236.6%—
200451.734.2%—
200546.430.8%—
200667.544.8%—
200764.242.6%—
20086543.0%—
200968.845.6%—
20105737.8%—
201162.541.5%—
201266.443.9%—
20135737.8%—
201464.442.8%—
201554.536.2%—
201652.334.6%—
201743.729.0%—
201867.744.9%—
201951.534.2%—
202054.235.9%—
202122.314.8%—
202218.512.3%—
202332.721.7%—
202437.725.0%—
202534.522.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY17.217.2May 1960Operating—coming soon

Owner / operator

Operator: U S Bureau of Reclamation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
U S Bureau of Reclamation100.0%17 MW

Nearby plants

Within 80 km.
Fall Creek2 MW21.6 km
Copco 2retired22.5 km
Iron Gateretired22.8 km
Copco 1retired23.6 km
Dry Creek LFG to Energy Projectretired34.6 km
Eagle Point Solar10 MW38.8 km