← Back to map

Encino Solar Energy Center

Sandoval County, New Mexico · EIA plant ID 63860 · Operator: Exus New Mexico
SolarSolar PhotovoltaicBA: PNM
Nameplate55MWSummer 55 MW
Generators1in service
Net generation131GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2020202120222023202420252026202727.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202083.434.3%—
2021144.430.0%—
2022143.229.7%—
2023141.329.3%—
2024142.429.5%—
202514329.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ESECSolar PhotovoltaicPV5555Jul 2020Operating—coming soon

Owner / operator

Operator: Exus New Mexico. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Exus New Mexico100.0%55 MW

Nearby plants

Within 80 km.
NMRD Data Center III, LLC50 MW1.9 km
Sandoval Solar Energy Center6 MW8.8 km
TAG198 MW9.2 km
ASG-2 Community Solar5 MW13.1 km
Quail Ranch Solar and BESS200 MW17.2 km
Atrisco Energy Storage300 MW18.1 km