← Back to map

Sugar Solar, LLC

Yadkin County, North Carolina · EIA plant ID 63807 · Operator: SunStrong Management
SolarSolar PhotovoltaicBA: DUK
Nameplate60MWSummer 60 MW
Generators1in service
Net generation98GWh12 mo to Aug 2026
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202120222023202420252026202718.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202100.0%—
2022124.823.8%—
2023112.321.4%—
2024104.819.9%—
2025110.321.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PGR29Solar PhotovoltaicPV6060Dec 2021Operating—coming soon

Owner / operator

Operator: SunStrong Management. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunStrong Management100.0%60 MW

Nearby plants

Within 80 km.
1009 Yadkin Solar5 MW1.5 km
Yadkin 601 Farm3 MW5.6 km
Yadkinville Solar4 MW6.1 km
1008 Matthews Solar5 MW11.3 km
Two Hearted Solar22 MW11.9 km
Ashley Solar Farm4 MW13.3 km