← Back to map

Yadkinville Solar

Yadkin County, North Carolina · EIA plant ID 59950 · Operator: Oppidum Renewables USA, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate4MWSummer 4 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202612.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201500.0%—
20166.721.7%—
20176.621.5%—
20186.320.5%—
20194.113.4%—
20203.110.1%—
20216.220.3%—
20226.721.7%—
20236.320.7%—
20244.514.6%—
2025412.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
YAKSolar PhotovoltaicPV3.53.5Dec 2015Operating—coming soon

Owner / operator

Operator: Oppidum Renewables USA, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Oppidum Renewables USA, LLC100.0%4 MW

Nearby plants

Within 80 km.
1009 Yadkin Solar5 MW5.5 km
Sugar Solar, LLC60 MW6.1 km
1008 Matthews Solar5 MW9.7 km
Two Hearted Solar22 MW11.3 km
Yadkin 601 Farm3 MW11.4 km
Perendale Holdings, LLC8 MW17.5 km