← Back to map

White Horse Solar A

Greenville County, South Carolina · EIA plant ID 63760 · Operator: White Horse Solar A
SolarSolar PhotovoltaicBA: DUK
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202618.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20200.38.9%—
2021422.7%—
20223.419.5%—
20233.419.6%—
20243.721.2%—
20253.318.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WHRSASolar PhotovoltaicPV22Nov 2020Operating—coming soon

Owner / operator

Operator: White Horse Solar A. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RPSC Solar 7, LLC100.0%2 MW

Nearby plants

Within 80 km.
Bob Jones University Cogen Plant4 MW10 km
Saluda Dam2 MW10.7 km
Piedmont Hydro Power Project1 MW11 km
Whitt Solar2 MW13.6 km
Ace Solar1 MW13.6 km
Adams2 MW15.6 km