Piedmont Hydro Power Project

Greenville County, South Carolina · EIA plant ID 10787 · Operator: Central Rivers Power US, LLC
HydroConventional HydroelectricBA: DUK
Nameplate1MWSummer 1 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor55%hydro units, summer MW
Heat rate—thermal plants only
First online1989

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%100%200%2005201020152020202554.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20013.135.5%—
200219.3220.7%—
20037.686.3%—
20046.674.6%—
20056.979.1%—
20064.956.3%—
20073.843.4%—
20082.831.9%—
2009557.2%—
20105.663.6%—
20113.944.0%—
2012556.5%—
20137.889.2%—
20146.372.1%—
20155.158.1%—
20163.438.5%—
20174.247.9%—
20186.574.0%—
20195.663.9%—
20205.461.4%—
20213.135.0%—
20220.55.8%—
20234.450.5%—
20244.551.1%—
20254.854.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Conventional HydroelectricHY11May 1989Operating—coming soon

Owner / operator

Operator: Central Rivers Power US, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Central Rivers Power US, LLC100.0%1 MW

Nearby plants

Within 80 km.
Whitt Solar2 MW6.1 km
Adams2 MW6.1 km
Pelzer Solar I1 MW6.1 km
Ace Solar1 MW6.3 km
Pelzer Upper2 MW6.7 km
Pelzer Lower3 MW9.6 km