← Back to map

Pelzer Upper

Anderson County, South Carolina · EIA plant ID 10799 · Operator: Central Rivers Power US, LLC
HydroConventional HydroelectricBA: DUK
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor23%hydro units, summer MW
Heat rate—thermal plants only
First online1989

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202523.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20013.118.5%—
20024.325.8%—
20038.450.4%—
2004741.8%—
20057.645.6%—
2006530.0%—
200700.1%—
200800.0%—
20095.834.6%—
20106.539.2%—
20116.136.4%—
2012741.9%—
20131484.4%—
201411.368.1%—
20158.852.6%—
2016635.9%—
20175.532.8%—
201810.261.5%—
20195.734.4%—
20205.834.8%—
2021424.1%—
20224.527.0%—
20234.627.7%—
20244.728.0%—
20253.823.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Conventional HydroelectricHY21.9Dec 1989Operating—coming soon

Owner / operator

Operator: Central Rivers Power US, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Central Rivers Power US, LLC100.0%2 MW

Nearby plants

Within 80 km.
Pelzer Lower3 MW2.9 km
Pelzer Solar I1 MW4.7 km
W S Lee955 MW4.8 km
Piedmont Hydro Power Project1 MW6.7 km
Adams2 MW8.9 km