Rawhide Prairie Solar Hybrid
Larimer County, Colorado · EIA plant ID 63722 · Operator: Greenbacker Renewable Energy Corporation
Nameplate23MWSummer 23 MW
Generators2in service
Net generation45GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 0 | — | — |
| 2021 | 35.9 | 22.3% | — |
| 2022 | 49.5 | 25.8% | — |
| 2023 | 47.3 | 24.6% | — |
| 2024 | 43.7 | 22.6% | — |
| 2025 | 44.9 | 23.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BA1 | Batteries | BA | 1 | 1 | Mar 2021 | Operating | — | coming soon |
| PV1 | Solar Photovoltaic | PV | 22 | 22 | Mar 2021 | Operating | — | coming soon |
Owner / operator
Operator: Greenbacker Renewable Energy Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Greenbacker Renewable Energy Corporation | 100.0% | 23 MW |
Nearby plants
Within 80 km.
| Rawhide | 800 MW | 0.6 km |
| Bison Solar LLC | 30 MW | 0.7 km |
| Pivot Solar 42 LLC | — | 18.6 km |
| Roundhouse Renewable Energy II | 106 MW | 21.9 km |
| Roundhouse Wind Energy Project | 226 MW | 27.5 km |
| South Cheyenne Solar | 150 MW | 27.6 km |