← Back to map

Red Lake Falls Community Hybrid

Red Lake County, Minnesota · EIA plant ID 63689 · Operator: RWE Clean Energy
WindOnshore Wind TurbineSolar PhotovoltaicMISOBA: MISO
Nameplate6MWSummer 6 MW
Generators2in service
Net generation15GWh12 mo to Dec 2025
Capacity factor35%wind units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202020212022202320242025202634.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20201.30.0%—
202117.40.0%—
202219.10.0%—
202315.837.4%—
20241432.8%—
202514.734.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RLFSSolar PhotovoltaicPV11Dec 2020Operating—coming soon
RLFWOnshore Wind TurbineWT4.64.6Dec 2020Operating—ge 2.3-116

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%6 MW

Nearby plants

Within 80 km.
Thief River Falls7 MW26 km
American Crystal Sugar Crookston7 MW27.9 km
American Crystal Sugar East Grand Forks8 MW51.4 km
Halstad4 MW72.2 km
American Crystal Sugar Hillsboro13 MW75.8 km
Hillsboro4 MW78.8 km