American Crystal Sugar Hillsboro

Traill County, North Dakota · EIA plant ID 54210 · Operator: American Crystal Sugar Co
CoalConventional Steam CoalMISOBA: MISO
Nameplate13MWSummer 13 MW
Generators1in service
Net generation85GWh12 mo to Dec 2025
Capacity factor73%gas/coal/oil units, summer MW
Heat rate5,687Btu/kWhfossil units, electric fuel, HHV
First online1990Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202573.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,00030,000200520102015202020255,687 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200171.761.6%28,837
200263.154.2%28,837
200388.576.0%19,014
200489.576.6%19,014
200586.774.4%19,014
200677.566.5%19,014
200781.469.8%18,026
20088169.3%17,440
200982.871.1%19,014
201076.165.3%18,744
201163.554.5%19,014
201259.450.8%18,683
201365.155.9%19,206
201459.651.2%19,179
201565.356.1%19,206
201674.864.0%5,922
201770.460.4%5,922
201800.0%—
201900.0%—
202060.952.2%5,687
202175.965.1%5,687
202292.379.2%5,687
202391.878.8%5,895
202487.174.5%5,687
202585.273.2%5,687

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
G1Conventional Steam CoalST13.313.3Sep 1990Operating—coming soon

Owner / operator

Operator: American Crystal Sugar Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
American Crystal Sugar Co100.0%13 MW

Nearby plants

Within 80 km.
Hillsboro4 MW4.5 km
Halstad4 MW19.9 km
American Crystal Sugar Crookston7 MW48.6 km
American Crystal Sugar East Grand Forks8 MW54.6 km
Marvin Composites3 MW61.8 km
USS JJ Clay Solar LLC CSG1 MW62.2 km