DCO Burlington
Burlington County, New Jersey · EIA plant ID 63492 · Operator: Cartier Energy, LLC
Nameplate4MWSummer 3 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online2012Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 18.1 | 76.6% | 12,324 |
| 2020 | 16 | 67.5% | 12,363 |
| 2021 | 15.9 | 67.1% | 10,195 |
| 2022 | 16.2 | 68.4% | 13,055 |
| 2023 | 17.5 | 73.9% | 13,711 |
| 2024 | 16.8 | 71.0% | 12,710 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CTG-1 | Natural Gas Fired Combustion Turbine | GT | 3.5 | 2.7 | Jun 2012 | Operating | — | coming soon |
Owner / operator
Operator: Cartier Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Cartier Energy, LLC | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| BJ's Wholesale Club Inc Dist Center | 1 MW | 1.1 km |
| Christmas Tree Shops DC Burlington NJ | 2 MW | 1.2 km |
| Burlington Coat Factory Solar | 3 MW | 2.3 km |
| American Goldfinch SCS ACY2 NJ, LLC | 4 MW | 2.8 km |
| Florence Solar W3-080, LLC | 8 MW | 3.6 km |
| PSEG Burlington Generating Station | 242 MW | 5.7 km |