Burlington Coat Factory Solar
Burlington County, New Jersey · EIA plant ID 62712 · Operator: DG Northeast Solar II, LLC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2018
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2018 | 0 | 0.0% | — |
| 2019 | 4.6 | 20.1% | — |
| 2020 | 4.6 | 20.3% | — |
| 2021 | 4.6 | 20.4% | — |
| 2022 | 4.9 | 21.7% | — |
| 2023 | 4.7 | 20.6% | — |
| 2024 | 4.6 | 20.1% | — |
| 2025 | 4.5 | 19.7% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BCF | Solar Photovoltaic | PV | 2.6 | 2.6 | Dec 2018 | Operating | — | coming soon |
Owner / operator
Operator: DG Northeast Solar II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| DG Northeast Solar II, LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Christmas Tree Shops DC Burlington NJ | 2 MW | 1.3 km |
| BJ's Wholesale Club Inc Dist Center | 1 MW | 1.7 km |
| Florence Solar W3-080, LLC | 8 MW | 1.7 km |
| DCO Burlington | 4 MW | 2.3 km |
| American Goldfinch SCS ACY2 NJ, LLC | 4 MW | 2.9 km |
| PSEG Burlington Generating Station | 242 MW | 6.3 km |