← Back to map

Wister Solar

Imperial County, California · EIA plant ID 63487 · Operator: Wister Solar
SolarSolar PhotovoltaicBA: IID
Nameplate20MWSummer 20 MW
Generators1in service
Net generation33GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202618.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202218.921.3%—
202329.716.9%—
202428.216.1%—
20253318.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WSOLSolar PhotovoltaicPV2020Jul 2022Operating—coming soon

Owner / operator

Operator: Wister Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wister Solar100.0%20 MW

Nearby plants

Within 80 km.
Imperial Valley Solar Co (IVSC) 2, LLC20 MW2 km
Imperial Valley Solar Company 1 LLC23 MW2.7 km
Niland Gas Turbine Plant121 MW3.4 km
John L. Featherstone Plant55 MW9.7 km
Citizens Imperial Solar30 MW10.8 km
CE Turbo LLC12 MW11.4 km