← Back to map

Bearkat II Wind Energy LLCUnder construction

Glasscock County, Texas · EIA plant ID 63342 · Operator: McCrae Wind Energy II, LLC
WindERCOTBA: ERCO

162 MW under construction (Onshore Wind Turbine), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 162 MW building
Net generation534GWh12 mo to Aug 2026
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025529.2——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BKIIOnshore Wind TurbineWT162.1162.1planned Dec 2026Under construction—coming soon

Owner / operator

Operator: McCrae Wind Energy II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Bearkat197 MW9.3 km
Champaign BESS, LLC—14.4 km
Rattlesnake Den207 MW17.2 km
Pioneer Hutt Wind Energy140 MW22.2 km
Garden City East BESS10 MW23.2 km
Lacy Creek Wind Energy Center301 MW35.7 km