← Back to map

Bearkat

Glasscock County, Texas · EIA plant ID 59972 · Operator: Bearkat Wind Energy 1, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate197MWSummer 197 MW
Generators1in service
Net generation685GWh12 mo to Aug 2026
Capacity factor40%wind units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2018202020222024202639.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2018727.546.1%—
2019753.843.8%—
2020683.839.6%—
2021596.534.6%—
202261335.6%—
202359634.6%—
2024681.539.4%—
2025648.337.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BRKATOnshore Wind TurbineWT196.7196.7Feb 2018Operating—vestas V126-3.45

Owner / operator

Operator: Bearkat Wind Energy 1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bearkat Wind Energy 1, LLC100.0%197 MW

Nearby plants

Within 80 km.
Rattlesnake Den207 MW8.6 km
Bearkat II Wind Energy LLC—9.3 km
Garden City East BESS10 MW18.9 km
Champaign BESS, LLC—21.8 km
Lacy Creek Wind Energy Center301 MW26.8 km
Pioneer Hutt Wind Energy140 MW31.5 km