Garrett Solar
Lake County, Oregon · EIA plant ID 63301 · Operator: SOLV Inc.
Nameplate10MWSummer 10 MW
Generators1in service
Net generation22GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2019
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 0.2 | 3.0% | — |
| 2020 | 23.3 | 26.6% | — |
| 2021 | 24.9 | 28.5% | — |
| 2022 | 25.3 | 28.9% | — |
| 2023 | 22.6 | 25.9% | — |
| 2024 | 22.7 | 25.8% | — |
| 2025 | 22.4 | 25.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1888 | Solar Photovoltaic | PV | 10 | 10 | Dec 2019 | Operating | — | coming soon |
Owner / operator
Operator: SOLV Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Garrett Solar, LLC | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| Airport Solar | 47 MW | 1.1 km |
| Black Cap Solar Plant | 2 MW | 3.5 km |
| BC Solar | 8 MW | 3.7 km |
| OR Solar 6, LLC | 10 MW | 6.1 km |
| Old Mill Solar | 5 MW | 53.5 km |
| Bly Solar Center | 8 MW | 57.5 km |