← Back to map

Airport Solar

Lake County, Oregon · EIA plant ID 62560 · Operator: Airport Solar LLC
SolarSolar PhotovoltaicBA: PACW
Nameplate47MWSummer 47 MW
Generators1in service
Net generation95GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20192020202120222023202420252026202723.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20191.13.1%—
2020101.724.5%—
2021102.324.7%—
2022116.628.1%—
2023105.325.4%—
2024102.324.6%—
2025104.425.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
APSSolar PhotovoltaicPV47.347.3Dec 2019Operating—coming soon

Owner / operator

Operator: Airport Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Airport Solar LLC100.0%47 MW

Nearby plants

Within 80 km.
Garrett Solar10 MW1.1 km
Black Cap Solar Plant2 MW3.3 km
BC Solar8 MW3.5 km
OR Solar 6, LLC10 MW5.2 km
Old Mill Solar5 MW53.2 km
Bly Solar Center8 MW56.8 km