Brazoria County, Texas · EIA plant ID 63273 · Operator: Cubico USA, LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate120MWSummer 120 MW
Generators1in service
Net generation217GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202720.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020119.927.2%—
2021229.821.9%—
2022236.622.5%—
202319218.3%—
2024208.319.8%—
2025235.422.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1215Solar PhotovoltaicPV120120Aug 2020Operating—coming soon

Owner / operator

Operator: Cubico USA, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Cubico USA, LLC100.0%120 MW

Nearby plants

Within 80 km.
Long Point Solar120 MW1.7 km
Elio Energy LLC—2.7 km
Brazoria West200 MW5.7 km
Nash Solar—6.2 km
TX23 Roughneck Storage50 MW9.2 km
Castor—10.3 km