← Back to map

CastorUnder construction

Brazoria County, Texas · EIA plant ID 65870 · Operator: Engie North America
BatteryERCOTBA: ERCO

200 MW under construction (Batteries), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 200 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CASTRBatteriesBA200200planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Engie North America. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Prospect Storage10 MW0.1 km
TX23 Roughneck Storage50 MW1.5 km
Bell Creek BESS LLC—2.2 km
Brazos River BESS LLC—2.9 km
Brazoria West200 MW4.7 km
Second Division Solar100 MW9.1 km