Clover Creek Solar Community Solar
Juab County, Utah · EIA plant ID 63061 · Operator: AES Distributed Energy
Nameplate80MWSummer 80 MW
Generators1in service
Net generation195GWh12 mo to Aug 2026
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2021
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 0 | 0.0% | — |
| 2022 | 207 | 29.5% | — |
| 2023 | 195.8 | 27.9% | — |
| 2024 | 199.6 | 28.4% | — |
| 2025 | 196.5 | 28.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CLVR | Solar Photovoltaic | PV | 80 | 80 | Dec 2021 | Operating | — | coming soon |
Owner / operator
Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| AES Distributed Energy | 100.0% | 80 MW |
Nearby plants
Within 80 km.
| Currant Creek | 567 MW | 2.2 km |
| Payson | 20 MW | 27.9 km |
| Nebo Power Station | 140 MW | 28 km |
| Faraday Energy Storage | 150 MW | 31 km |
| Faraday Solar | 525 MW | 32.7 km |
| Spanish Fork | 4 MW | 35.9 km |