Juab County, Utah · EIA plant ID 56102 · Operator: PacifiCorp
Natural gasNatural Gas Fired Combined CycleBA: PACE
Nameplate567MWSummer 524 MW
Generators3in service
Net generation2,594GWh12 mo to Aug 2026
Capacity factor57%gas/coal/oil units, summer MW
Heat rate7,445Btu/kWhfossil units, electric fuel, HHV
First online2005Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1000100200300GWh20052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202556.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,00012,000200520102015202020257,445 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2005204.414.1%12,457
20061,970.848.2%7,593
20073,606.278.1%7,222
20082,799.660.5%7,136
20092,479.752.4%7,236
20102,538.353.7%7,383
20112,39250.6%7,530
20122,132.546.3%7,515
20132,36051.4%7,543
20142,497.454.4%7,413
20152,257.149.2%7,490
20161,475.132.0%7,619
20171,193.226.0%7,812
20182,418.352.7%7,453
20192,917.563.6%7,395
20202,335.450.7%7,486
20212,746.359.8%7,447
20222,80661.1%7,478
20232,879.962.7%7,402
20242,861.462.2%7,361
20252,803.161.1%7,488

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CT1ANatural Gas Fired Combined CycleCT146.2135Jun 2005Operating—coming soon
CT1BNatural Gas Fired Combined CycleCT146.2135Jun 2005Operating—coming soon
ST1Natural Gas Fired Combined CycleCA274.5254Apr 2006Operating—coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%567 MW

Nearby plants

Within 80 km.
Clover Creek Solar Community Solar80 MW2.2 km
Payson20 MW30 km
Nebo Power Station140 MW30.1 km
Faraday Energy Storage150 MW32.6 km
Faraday Solar525 MW34.3 km
Spanish Fork4 MW37.8 km