← Back to map

Gold Creek

Juneau County, Alaska · EIA plant ID 63 · Operator: Alaska Electric Light&Power Co
OilConventional HydroelectricPetroleum Liquids
Nameplate10MWSummer 10 MW
Generators8in service
Net generation5GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1914Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.500.511.5GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%0%0%200520102015202020250.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,00020052010201520202025
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20015.6——
20024.9——
20034.60.0%10,750
20044.90.0%9,667
20055——
20064.3——
20074.20.0%12,124
20084.70.0%11,625
20094.60.0%7,600
20104.50.0%14,353
20114.90.0%7,043
201240.0%—
20134.70.0%11,143
20145.70.0%12,667
20156.50.0%13,714
20164.60.0%14,250
20174.60.0%25,200
20184.10.0%13,714
20190.40.0%26,333
2020-0.4-0.0%—
20215.40.0%10,200
202270.0%12,333
20239.10.0%14,111
20245.40.0%13,143
20254.60.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY0.80.8Sep 1951Operating—coming soon
2Conventional HydroelectricHY0.40.4Nov 1914Operating—coming soon
3Conventional HydroelectricHY0.40.4Nov 1914Operating—coming soon
IC1Petroleum LiquidsIC1.21.2Jun 1952Operating (Standby / backup)—coming soon
IC2Petroleum LiquidsIC1.21.2Aug 1954Operating (Standby / backup)—coming soon
IC3Petroleum LiquidsIC1.11.1Aug 1961Operating (Standby / backup)—coming soon
IC4Petroleum LiquidsIC3.53.5Sep 1963Operating (Standby / backup)—coming soon
IC5Petroleum LiquidsIC1.11.1Oct 1966Operating (Standby / backup)—coming soon

Owner / operator

Operator: Alaska Electric Light&Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Alaska Electric Light&Power Co100.0%10 MW

Nearby plants

Within 80 km.
Salmon Creek 19 MW3.2 km
Lemon Creek62 MW6.6 km
Industrial Plant42 MW12.8 km
Auke Bay36 MW15.8 km
Annex Creek4 MW18.5 km
Lake Dorothy Hydroelectric Project14 MW23 km