Industrial Plant
Juneau County, Alaska · EIA plant ID 59793 · Operator: Alaska Electric Light&Power Co
Nameplate42MWSummer 24 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor-0%!gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online2016Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | 0.1 | 0.4% | — |
| 2017 | 0.1 | 0.0% | — |
| 2018 | 0.1 | 0.1% | — |
| 2019 | 0.3 | 0.1% | 22,921 |
| 2020 | -0 | -0.0% | — |
| 2021 | -0.1 | -0.1% | — |
| 2022 | -0 | -0.0% | — |
| 2023 | -0.1 | -0.1% | — |
| 2024 | 0 | 0.0% | — |
| 2025 | -0.1 | -0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 15 | Petroleum Liquids | GT | 41.7 | 23.5 | Nov 2016 | Operating | — | coming soon |
Owner / operator
Operator: Alaska Electric Light&Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Alaska Electric Light&Power Co | 100.0% | 42 MW |
Nearby plants
Within 80 km.
| Auke Bay | 36 MW | 3.1 km |
| Lemon Creek | 62 MW | 6.8 km |
| Salmon Creek 1 | 9 MW | 9.6 km |
| Gold Creek | 10 MW | 12.8 km |
| Annex Creek | 4 MW | 30.1 km |
| Lake Dorothy Hydroelectric Project | 14 MW | 35.7 km |