Mesa CSG 2 Massicotte

Mesa County, Colorado · EIA plant ID 62718 · Operator: Standard Solar
SolarSolar PhotovoltaicBA: PSCO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202625.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20192.123.4%—
20203.728.3%—
20213.224.0%—
2022215.0%—
2023322.5%—
20243.325.3%—
20253.325.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
X0037Solar PhotovoltaicPV1.51.5May 2019Operating—coming soon

Owner / operator

Operator: Standard Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Standard Solar100.0%2 MW

Nearby plants

Within 80 km.
Pivot Solar 57 LLC—2.9 km
USS Fruita Solar LLC CSG2 MW5.2 km
Mesa PV12 MW8.1 km
Vinelands Power Plant5 MW9 km
Grand Valley Project Power Plantretired9 km
Oak Leaf Solar XXXI LLC (CSG)2 MW14.1 km