Oak Leaf Solar XXXI LLC (CSG)

Mesa County, Colorado · EIA plant ID 62244 · Operator: Greenbacker Renewable Energy Corporation
SolarSolar PhotovoltaicBA: PSCO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20182019202020212022202320242025202626.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201800.0%—
20193.627.4%—
20203.727.9%—
20213.728.2%—
20223.224.2%—
20233.324.9%—
20243.426.0%—
20253.426.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
53977Solar PhotovoltaicPV1.51.5Dec 2018Operating—coming soon

Owner / operator

Operator: Greenbacker Renewable Energy Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Greenbacker Renewable Energy Corporation100.0%2 MW

Nearby plants

Within 80 km.
Grand Valley Project Power Plantretired5.3 km
Vinelands Power Plant5 MW5.3 km
USS Fruita Solar LLC CSG2 MW10.7 km
Mesa CSG 2 Massicotte2 MW14.1 km
Pivot Solar 57 LLC—15.4 km
Mesa PV12 MW18.5 km