Wildcat Creek Wind Farm LLC
Cooke County, Texas · EIA plant ID 62715 · Operator: Wildcat Creek Wind Farm LLC
Nameplate175MWSummer 175 MW
Generators1in service
Net generation481GWh12 mo to Aug 2026
Capacity factor31%wind units, summer MW
Heat rate—thermal plants only
First online2021
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 271.2 | 34.1% | — |
| 2022 | 575.1 | 36.4% | — |
| 2023 | 560.1 | 36.5% | — |
| 2024 | 544.4 | 35.4% | — |
| 2025 | 447.1 | 29.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WCCWF | Onshore Wind Turbine | WT | 175.3 | 175.3 | Jul 2021 | Operating | — | gamesa G126-2.5 |
Owner / operator
Operator: Wildcat Creek Wind Farm LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Wildcat Creek Wind Farm LLC | 100.0% | 175 MW |
Nearby plants
Within 80 km.
| Regis Muenster | 10 MW | 10.2 km |
| Compadre Solar | 150 MW | 10.9 km |
| BT Cooke Solar, LLC | 59 MW | 13.9 km |
| Tyler Bluff Wind Project, LLC | 126 MW | 17.6 km |
| Oakley BESS | — | 19.6 km |