← Back to map

1047 Little Mountain Solar, LLC

Yadkin County, North Carolina · EIA plant ID 62661 · Operator: CI-II Mitchell Holding LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2019202020212022202320242025202614.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20191.432.3%—
20205.721.6%—
2021622.9%—
20224.717.7%—
20233.513.4%—
20243.513.2%—
20253.714.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1047Solar PhotovoltaicPV33Nov 2019Operating—coming soon

Owner / operator

Operator: CI-II Mitchell Holding LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CI-II Mitchell Holding LLC100.0%3 MW

Nearby plants

Within 80 km.
1051 Lucky Solar, LLC3 MW5.5 km
Ashley Solar Farm4 MW7.9 km
Partin Solar50 MW8 km
Yadkin 601 Farm3 MW9.8 km
1001 Ebenezer Church Solar5 MW10.2 km
Sugar Solar, LLC60 MW14 km