SFDK Solar
Solano County, California · EIA plant ID 62649 · Operator: AES Distributed Energy
Nameplate6MWSummer 6 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2019
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 0.1 | 1.5% | — |
| 2020 | 10.8 | 19.5% | — |
| 2021 | 10.7 | 19.3% | — |
| 2022 | 10.5 | 19.0% | — |
| 2023 | 10 | 18.2% | — |
| 2024 | 10.2 | 18.4% | — |
| 2025 | 10 | 18.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SFDK | Solar Photovoltaic | PV | 6.3 | 6.3 | Dec 2019 | Operating | — | coming soon |
Owner / operator
Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| AES Distributed Energy | 100.0% | 6 MW |
Nearby plants
Within 80 km.
| American Canyon Solar | 3 MW | 3.5 km |
| Sutter Home Winery GIR | 1 MW | 7.2 km |
| Coca Cola American Canyon | retired | 7.5 km |
| American Canyon RV Boat Storage | — | 7.6 km |
| C&H Sugar Plant | 8 MW | 8.4 km |
| Crockett Cogen Project | 247 MW | 8.5 km |