American Canyon RV Boat StorageUnder construction
Napa County, California · EIA plant ID 69222 · Operator: Napa Junction RV Storage LLC
2 MW under construction (Solar Photovoltaic), first expected Apr 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 2 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 5381 | Solar Photovoltaic | PV | 1.9 | 1.9 | planned Apr 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Napa Junction RV Storage LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Sutter Home Winery GIR | 1 MW | 0.6 km |
| Coca Cola American Canyon | retired | 1.8 km |
| Soscol Ferry Solar | 2 MW | 4.7 km |
| Dynamo Solar LLC | — | 4.7 km |
| American Canyon Solar | 3 MW | 5.6 km |
| Kaiser Napa Valley Corporate Dr Fuel Cell | 5 MW | 6.5 km |