← Back to map

Arborgate Solar

Chatham County, North Carolina · EIA plant ID 62623 · Operator: strata manager, llc
SolarSolar PhotovoltaicBA: CPLW
Nameplate5MWSummer 5 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202621.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20197.418.5%—
20209.421.4%—
20219.421.6%—
20229.421.6%—
20239.621.9%—
20249.521.5%—
20259.421.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ARBORSolar PhotovoltaicPV55Feb 2019Operating—coming soon

Owner / operator

Operator: strata manager, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Arborgate Farm, LLC100.0%5 MW

Nearby plants

Within 80 km.
Tinker (NC)5 MW3.6 km
Jordan Hydroelectric Project4 MW8.4 km
Lockville Hydropowerretired11.3 km
Vickers2 MW12.3 km
Farrington Farm1 MW15.4 km
Flatwood Farm5 MW16.4 km