Jordan Hydroelectric Project
Chatham County, North Carolina · EIA plant ID 58390 · Operator: Jordan Hydroelectric LTD PTP
Nameplate4MWSummer 4 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2012
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2013 | 14.7 | 38.1% | — |
| 2014 | 12.6 | 32.8% | — |
| 2015 | 12.9 | 33.4% | — |
| 2016 | 11.6 | 30.1% | — |
| 2017 | 9.9 | 25.7% | — |
| 2018 | 10.3 | 26.7% | — |
| 2019 | 9.8 | 25.5% | — |
| 2020 | 15.7 | 40.7% | — |
| 2021 | 9.3 | 24.1% | — |
| 2022 | 5.2 | 13.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| EMOD | Conventional Hydroelectric | HY | 2.2 | 2.2 | Jan 2012 | Operating (Out of service, expected back within the year) | — | coming soon |
| WMOD | Conventional Hydroelectric | HY | 2.2 | 2.2 | Aug 2012 | Operating (Out of service, expected back within the year) | — | coming soon |
Owner / operator
Operator: Jordan Hydroelectric LTD PTP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Jordan Hydroelectric LTD PTP | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| Lockville Hydropower | retired | 4.5 km |
| Tinker (NC) | 5 MW | 7.2 km |
| Flatwood Farm | 5 MW | 8.1 km |
| Arborgate Solar | 5 MW | 8.4 km |
| Moncure Farm LLC | 3 MW | 10.1 km |
| Harris | 951 MW | 10.5 km |