← Back to map

Palmer Solar

El Paso County, Colorado · EIA plant ID 62495 · Operator: Duke Energy Renewables Services
SolarSolar PhotovoltaicBA: WACM
Nameplate60MWSummer 60 MW
Generators1in service
Net generation141GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2020202120222023202420252026202726.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020124.931.6%—
2021152.128.9%—
2022151.928.9%—
2023146.527.9%—
202414828.1%—
2025140.226.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
20181Solar PhotovoltaicPV6060Apr 2020Operating—coming soon

Owner / operator

Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Palmer Solar, LLC100.0%60 MW

Nearby plants

Within 80 km.
Ray D Nixon283 MW4.6 km
Front Range Power Plant554 MW4.7 km
Clear Spring Ranch PV Project10 MW4.8 km
Pike Solar Hybrid175 MW6.3 km
Fountain Valley Power Facility228 MW8.7 km
Carson Solar I2 MW15.2 km