← Back to map

Southfork Solar

Manatee County, Florida · EIA plant ID 62493 · Operator: Florida Power & Light Co
SolarSolar PhotovoltaicBA: FPL
Nameplate75MWSummer 75 MW
Generators1in service
Net generation175GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202726.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020127.325.9%—
2021179.127.5%—
202218027.6%—
2023180.627.7%—
2024161.724.7%—
2025144.722.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV74.574.5Apr 2020Operating—coming soon

Owner / operator

Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Florida Power & Light Co100.0%75 MW

Nearby plants

Within 80 km.
Long Branch Solar75 MW6.2 km
Elder Branch75 MW6.6 km
Three Creeks75 MW6.9 km
Keene Branch Solar—12 km
Grange Hall Solar61 MW12.3 km