Crossing Trails Wind Power Project LLC.

Kit Carson County, Colorado · EIA plant ID 62489 · Operator: EDP Renewables North America LLC
WindOnshore Wind TurbineBA: WACM
Nameplate104MWSummer 104 MW
Generators1in service
Net generation386GWh12 mo to Aug 2026
Capacity factor42%wind units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202120222023202420252026202742.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2021361.252.6%—
2022419.146.0%—
2023399.343.8%—
202442046.0%—
2025394.243.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Onshore Wind TurbineWT104104Apr 2021Operating—vestas V150-4.2

Owner / operator

Operator: EDP Renewables North America LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
EDP Renewables North America LLC100.0%104 MW

Nearby plants

Within 80 km.
Singing Grass Wind—17.4 km
Bronco Plains Wind, LLC300 MW18.1 km
Bronco Plains Wind II, LLC200 MW19.9 km
Dusty Rose Wind502 MW25.9 km
Dry Land Prairie Energy Storage—28.8 km
Cheyenne Ridge II—40.4 km