Melsam SolarPlanned

Dillon County, South Carolina · EIA plant ID 62280 · Operator: Melsam Solar
SolarBA: CPLE

65 MW planned (Solar Photovoltaic), first expected Nov 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
58Solar PhotovoltaicPV6565planned Nov 2028Planned—coming soon

Owner / operator

Operator: Melsam Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Whitetail Solar10 MW6 km
Cotton Solar—12.7 km
Jessamine Solar2 MW12.8 km
Cardinal Solar LLC7 MW16.2 km
Washington Solar II (SC)2 MW16.4 km
Washington Solar (SC)2 MW16.4 km