Washington Solar (SC)

Marion County, South Carolina · EIA plant ID 62342 · Operator: Headwater Energy, LLC
SolarSolar PhotovoltaicBA: CPLE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202622.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20232.517.3%—
2024528.3%—
20253.821.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
87Solar PhotovoltaicPV22Mar 2023Operating—coming soon

Owner / operator

Operator: Headwater Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Headwater Energy, LLC100.0%2 MW

Nearby plants

Within 80 km.
Washington Solar II (SC)2 MW0 km
Pruger Solar II2 MW6.4 km
Freedom Solar5 MW11 km
Jessamine Solar2 MW12.8 km
Cardinal Solar LLC7 MW13 km
Ebbie Solar, LLC10 MW16.1 km