AES Huntington Beach Energy Project

Orange County, California · EIA plant ID 62116 · Operator: AES Huntington Beach Energy, LLC
Natural gasNatural Gas Fired Combined CycleCAISOBA: CISO
Nameplate699MWSummer 630 MW
Generators3in service
Net generation1,700GWh12 mo to Aug 2026
Capacity factor31%gas/coal/oil units, summer MW
Heat rate6,962Btu/kWhfossil units, electric fuel, HHV
First online2020Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2020202120222023202420252026202730.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,6006,8007,0007,200202020212022202320242025202620276,962 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20201,285.226.5%7,192
20213,841.772.7%6,830
20223,91570.9%6,843
20233,045.255.2%6,981
20242,41543.6%6,825
20251,87834.0%6,913

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1ANatural Gas Fired Combined CycleCT231205Feb 2020Operating—coming soon
1BNatural Gas Fired Combined CycleCT231205Feb 2020Operating—coming soon
1SNatural Gas Fired Combined CycleCA237.2220Feb 2020Operating—coming soon

Owner / operator

Operator: AES Huntington Beach Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Huntington Beach Energy, LLC51.0%357 MW
Ullico Infrastructure Southland Borrower LLC49.0%343 MW

Nearby plants

Within 80 km.
AES Huntington Beach LLC218 MW0.2 km
Plant No 2 Orange County16 MW2.2 km
Hoag Hospital Cogen Plant6 MW4.7 km
OCSD5 MW6.4 km
Plant No 1 Orange County8 MW6.6 km
Orange Coast College PH2 Solar Project5 MW6.9 km