← Back to map

AES Huntington Beach LLCRetirement planned

Orange County, California · EIA plant ID 335 · Operator: AES Huntington Beach LLC
Natural gasNatural Gas Steam TurbineCAISOBA: CISO
Nameplate218MWSummer 226 MW
Generators1in service
Net generation3GWh12 mo to Aug 2026
Capacity factor0%gas/coal/oil units, summer MW
Heat rate13,438Btu/kWhfossil units, electric fuel, HHV
First online1958Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%200520102015202020250.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00011,00012,00013,0002005201020152020202513,438 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20011,381.1——
20021,357.4——
20031,387.618.6%10,970
20041,48618.7%10,820
20051,554.619.6%10,896
20061,014.112.8%11,723
20071,270.216.1%11,212
20081,53619.4%10,983
20091,046.313.2%11,205
2010931.711.8%11,174
20111,113.414.1%10,964
20121,167.616.1%11,116
2013851.721.5%10,763
2014912.223.1%10,565
2015722.518.3%10,792
2016486.212.3%11,093
201740910.3%11,197
2018319.58.1%11,533
2019221.75.9%12,734
2020107.45.4%12,395
202183.94.2%11,832
2022106.35.4%11,614
2023167.48.5%11,454
20245.70.3%12,938
20256.20.3%12,248

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2Natural Gas Steam TurbineST218225.8Dec 1958Operating · retirement plannedDec 2026coming soon
1ANatural Gas Fired Combined CycleCT231226planned Mar 2020not_current—coming soon
1BNatural Gas Fired Combined CycleCT231226planned Mar 2020not_current—coming soon
1SNatural Gas Fired Combined CycleCA231192planned Mar 2020not_current—coming soon
1Natural Gas Steam TurbineST218225.8Jun 1958Retired Dec 2019—coming soon
3Natural Gas Steam TurbineST225225May 1961Retired Nov 2012—coming soon
4Natural Gas Steam TurbineST227227Jul 1961Retired Nov 2012—coming soon
5Natural Gas Fired Combustion TurbineGT133133Apr 1969Retired Oct 2002—coming soon

Owner / operator

Operator: AES Huntington Beach LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Huntington Beach LLC100.0%218 MW

Nearby plants

Within 80 km.
AES Huntington Beach Energy Project699 MW0.2 km
Plant No 2 Orange County16 MW2.2 km
Hoag Hospital Cogen Plant6 MW4.6 km
OCSD5 MW6.5 km
Plant No 1 Orange County8 MW6.8 km
Orange Coast College PH2 Solar Project5 MW7 km