Nameplate218MWSummer 226 MW
Generators1in service
Net generation3GWh12 mo to Aug 2026
Capacity factor0%gas/coal/oil units, summer MW
Heat rate13,438Btu/kWhfossil units, electric fuel, HHV
First online1958Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 1,381.1 | — | — |
| 2002 | 1,357.4 | — | — |
| 2003 | 1,387.6 | 18.6% | 10,970 |
| 2004 | 1,486 | 18.7% | 10,820 |
| 2005 | 1,554.6 | 19.6% | 10,896 |
| 2006 | 1,014.1 | 12.8% | 11,723 |
| 2007 | 1,270.2 | 16.1% | 11,212 |
| 2008 | 1,536 | 19.4% | 10,983 |
| 2009 | 1,046.3 | 13.2% | 11,205 |
| 2010 | 931.7 | 11.8% | 11,174 |
| 2011 | 1,113.4 | 14.1% | 10,964 |
| 2012 | 1,167.6 | 16.1% | 11,116 |
| 2013 | 851.7 | 21.5% | 10,763 |
| 2014 | 912.2 | 23.1% | 10,565 |
| 2015 | 722.5 | 18.3% | 10,792 |
| 2016 | 486.2 | 12.3% | 11,093 |
| 2017 | 409 | 10.3% | 11,197 |
| 2018 | 319.5 | 8.1% | 11,533 |
| 2019 | 221.7 | 5.9% | 12,734 |
| 2020 | 107.4 | 5.4% | 12,395 |
| 2021 | 83.9 | 4.2% | 11,832 |
| 2022 | 106.3 | 5.4% | 11,614 |
| 2023 | 167.4 | 8.5% | 11,454 |
| 2024 | 5.7 | 0.3% | 12,938 |
| 2025 | 6.2 | 0.3% | 12,248 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 2 | Natural Gas Steam Turbine | ST | 218 | 225.8 | Dec 1958 | Operating · retirement planned | Dec 2026 | coming soon |
| 1A | Natural Gas Fired Combined Cycle | CT | 231 | 226 | planned Mar 2020 | not_current | — | coming soon |
| 1B | Natural Gas Fired Combined Cycle | CT | 231 | 226 | planned Mar 2020 | not_current | — | coming soon |
| 1S | Natural Gas Fired Combined Cycle | CA | 231 | 192 | planned Mar 2020 | not_current | — | coming soon |
| 1 | Natural Gas Steam Turbine | ST | 218 | 225.8 | Jun 1958 | Retired Dec 2019 | — | coming soon |
| 3 | Natural Gas Steam Turbine | ST | 225 | 225 | May 1961 | Retired Nov 2012 | — | coming soon |
| 4 | Natural Gas Steam Turbine | ST | 227 | 227 | Jul 1961 | Retired Nov 2012 | — | coming soon |
| 5 | Natural Gas Fired Combustion Turbine | GT | 133 | 133 | Apr 1969 | Retired Oct 2002 | — | coming soon |
Owner / operator
Operator: AES Huntington Beach LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| AES Huntington Beach LLC | 100.0% | 218 MW |
Nearby plants
Within 80 km.
| AES Huntington Beach Energy Project | 699 MW | 0.2 km |
| Plant No 2 Orange County | 16 MW | 2.2 km |
| Hoag Hospital Cogen Plant | 6 MW | 4.6 km |
| OCSD | 5 MW | 6.5 km |
| Plant No 1 Orange County | 8 MW | 6.8 km |
| Orange Coast College PH2 Solar Project | 5 MW | 7 km |