Camas Solar Project

Kittitas County, Washington · EIA plant ID 62071 · Operator: Altus Power America Management, LLC
SolarSolar PhotovoltaicBA: PSEI
Nameplate5MWSummer 5 MW
Generators1in service
Net generation11GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202624.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20221.35.0%—
202310.323.5%—
20249.722.2%—
202510.724.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CAMASSolar PhotovoltaicPV55Jun 2022Operating—coming soon

Owner / operator

Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Altus Power America Management, LLC100.0%5 MW

Nearby plants

Within 80 km.
Penstemon Solar Project5 MW0 km
Sagebrush Power Partners101 MW20.2 km
Wild Horse273 MW23.3 km
Swauk Wind LLC4 MW24.1 km
Vantage Wind Energy LLC90 MW25.3 km
Cowiche2 MW38.3 km