← Back to map

Cowiche

Yakima County, Washington · EIA plant ID 50423 · Operator: Yakima-Tieton Irrigation Dist
HydroConventional HydroelectricBA: PACW
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor24%hydro units, summer MW
Heat rate—thermal plants only
First online1987

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202523.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20014.129.1%—
20023.121.8%—
200300.0%—
20043.323.1%—
20053.525.0%—
20063.121.9%—
20073.524.7%—
20083.423.9%—
20093.827.2%—
20103.122.1%—
20113.121.8%—
20123.827.3%—
20133.524.9%—
20144.532.3%—
20154.531.8%—
20163.827.3%—
20173.222.5%—
20182.920.8%—
20192.920.8%—
20203.625.6%—
20213.424.0%—
20222.820.1%—
2023321.2%—
20242.719.2%—
20253.423.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
983Conventional HydroelectricHY1.71.6Mar 1987Operating—coming soon

Owner / operator

Operator: Yakima-Tieton Irrigation Dist. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Yakima-Tieton Irrigation Dist100.0%2 MW

Nearby plants

Within 80 km.
Orchard Avenue 12 MW11.6 km
Roza13 MW21.5 km
Tieton Dam Hydro Electric Project14 MW30.1 km
Drop 2 (WA)3 MW31.2 km
Drop 3 (WA)2 MW32.9 km
Camas Solar Project5 MW38.3 km