Greenfield Solar PV
Franklin County, Massachusetts · EIA plant ID 62063 · Operator: NSTAR Electric Company
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2019
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 2.7 | 15.4% | — |
| 2020 | 3.2 | 18.4% | — |
| 2021 | 3.1 | 17.9% | — |
| 2022 | 3.2 | 18.3% | — |
| 2023 | 3 | 17.0% | — |
| 2024 | 2.9 | 16.8% | — |
| 2025 | 2.6 | 15.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| LG400 | Solar Photovoltaic | PV | 2 | 2 | Jan 2019 | Operating | — | coming soon |
Owner / operator
Operator: NSTAR Electric Company. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| NSTAR Electric Company | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Turners Falls | 6 MW | 3.9 km |
| Cabot | 62 MW | 5.8 km |
| Kearsarge Montague | 4 MW | 6.1 km |
| Kearsarge Montague BD(CSG) | 4 MW | 6.3 km |
| Axio Green LLC | 2 MW | 7.5 km |
| Deerfield CSG Solar | 5 MW | 8.6 km |