← Back to map

Kearsarge Montague BD(CSG)

Franklin County, Massachusetts · EIA plant ID 64620 · Operator: Kearsarge Montague BD LLC
SolarBatteriesSolar PhotovoltaicISONEBA: ISNE
Nameplate4MWSummer 4 MW
Generators2in service
Net generation3GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20212022202320242025202615.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20210.25.2%—
20223.617.1%—
20233.316.0%—
20243.416.2%—
20253.115.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MBBATBatteriesBA1.31.3Nov 2021Operating—coming soon
MBDSolar PhotovoltaicPV2.52.5Nov 2021Operating—coming soon

Owner / operator

Operator: Kearsarge Montague BD LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Kearsarge Montague BD LLC100.0%4 MW

Nearby plants

Within 80 km.
Kearsarge Montague4 MW0.5 km
Cabot62 MW1.8 km
Turners Falls6 MW2.5 km
Deerfield CSG Solar5 MW3.6 km
Axio Green LLC2 MW4.4 km
French King Solar LLC5 MW5.7 km