← Back to map

Tacoma

La Plata County, Colorado · EIA plant ID 6206 · Operator: Public Service Co of Colorado
HydroConventional HydroelectricBA: WACM
Nameplate5MWSummer 5 MW
Generators2in service
Net generation2GWh12 mo to Dec 2025
Capacity factor5%hydro units, summer MW
Heat rate—thermal plants only
First online1905

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-101234GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%200520102015202020254.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200126.736.2%—
20029.212.5%—
200316.822.8%—
200426.636.0%—
200519.125.6%—
200613.918.7%—
20072229.2%—
200818.123.9%—
200913.317.6%—
201016.340.3%—
201119.748.9%—
201212.531.0%—
20136.516.1%—
20140.30.7%—
20151.12.8%—
201649.9%—
201713.433.3%—
20183.68.9%—
201921.753.7%—
20202.45.9%—
2021-0.2-0.4%—
2022-0.2-0.4%—
202312.4%—
20244.310.7%—
20251.94.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY2.32.3Jun 1906Operating—coming soon
2Conventional HydroelectricHY2.32.3Jun 1905Operating—coming soon
3Conventional HydroelectricHY3.54Jun 1949Retired Dec 2007—coming soon

Owner / operator

Operator: Public Service Co of Colorado. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Public Service Co of Colorado100.0%5 MW

Nearby plants

Within 80 km.
Vallecito Hydroelectric6 MW24.2 km
Ames Hydro4 MW39.1 km
Williams Ignacio Natural Gas Plant6 MW42.1 km
LPEA Sunnyside Solar 1 Facility2 MW45 km
Cortez Solar 1, LLC2 MW67.9 km
McPhee1 MW70 km