Adams Nielson Solar

Adams County, Washington · EIA plant ID 61933 · Operator: strata manager, llc
SolarSolar PhotovoltaicBA: AVA
Nameplate19MWSummer 19 MW
Generators1in service
Net generation38GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202622.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20181.24.3%—
201943.325.8%—
202045.426.9%—
202143.425.8%—
202234.920.8%—
202337.122.0%—
202440.824.2%—
202544.626.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ADAMSSolar PhotovoltaicPV19.219.2Nov 2018Operating—coming soon

Owner / operator

Operator: strata manager, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Adams Nielson Solar, LLC100.0%19 MW

Nearby plants

Within 80 km.
Rattlesnake Flat144 MW4.4 km
Lower Monumental810 MW44 km
Russell D Smith6 MW44.4 km
Quincy Chuteretired48.4 km
Saddle Mountain East Wind Farm—58.1 km
Little Goose810 MW61.3 km