Brush Solar Center
Baker County, Oregon · EIA plant ID 61844 · Operator: Enerparc Inc.
Nameplate3MWSummer 3 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2020
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 6.1 | 24.6% | — |
| 2021 | 6.5 | 26.4% | — |
| 2022 | 6.3 | 25.8% | — |
| 2023 | 6.1 | 24.9% | — |
| 2024 | 5.5 | 22.3% | — |
| 2025 | 6.4 | 26.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BRUSH | Solar Photovoltaic | PV | 2.8 | 2.8 | Jan 2020 | Operating | — | coming soon |
Owner / operator
Operator: Enerparc Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Enerparc Inc. | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Co-Gen LLC | 8 MW | 41 km |
| Baker City Solar | 15 MW | 43.7 km |
| Benson Creek Windfarm (Burnt River) | 10 MW | 69.2 km |
| Vale Solar Center | 3 MW | 69.4 km |
| Durbin Creek Windfarm (Burnt River) | 10 MW | 71.1 km |
| Jett Creek Windfarm (Burnt River) | 10 MW | 74 km |