← Back to map

Big Lake Project CSG

Sherburne County, Minnesota · EIA plant ID 61817 · Operator: Madison Energy Investments LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20182019202020212022202320242025202617.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20185.420.9%—
20198.719.8%—
20209.822.4%—
20218.719.8%—
20228.920.3%—
2023716.1%—
20248.920.3%—
20257.717.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BIGLASolar PhotovoltaicPV55Jun 2018Operating—coming soon

Owner / operator

Operator: Madison Energy Investments LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Madison Energy Investments LLC100.0%5 MW

Nearby plants

Within 80 km.
Big Lake Holdco Solar CSG5 MW1.3 km
USS Big Lake 1 Solar CSG1 MW2.8 km
Monticello Nuclear Facility685 MW4.5 km
Sherco Solar II237 MW7.2 km
SolarClub 10 LLC1 MW7.4 km
Monticello Project CSG5 MW7.4 km