← Back to map

Big Lake Holdco Solar CSG

Sherburne County, Minnesota · EIA plant ID 60836 · Operator: Big Lake Holdco LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation12GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202628.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20171.38.7%—
20185.512.6%—
20197.316.8%—
20204.610.5%—
2021511.4%—
20228.218.7%—
2023715.9%—
20248.319.0%—
202512.328.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BLAKESolar PhotovoltaicPV55Sep 2017Operating—coming soon

Owner / operator

Operator: Big Lake Holdco LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Big Lake Holdco LLC100.0%5 MW

Nearby plants

Within 80 km.
Big Lake Project CSG5 MW1.3 km
USS Big Lake 1 Solar CSG1 MW2.1 km
Monticello Nuclear Facility685 MW5.8 km
Monticello Project CSG5 MW8 km
SolarClub 10 LLC1 MW8.1 km
Sherco Solar II237 MW8.3 km