Lavio Solar
Sonoma County, California · EIA plant ID 61792 · Operator: Lavio Solar, LLC
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2018
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2018 | 2 | 30.4% | — |
| 2019 | 1.9 | 22.0% | — |
| 2020 | 2.1 | 23.4% | — |
| 2021 | 2 | 23.4% | — |
| 2022 | 1.9 | 21.9% | — |
| 2023 | 1.8 | 20.3% | — |
| 2024 | 1.7 | 19.2% | — |
| 2025 | 1.9 | 22.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 5002 | Solar Photovoltaic | PV | 1 | 1 | Apr 2018 | Operating | — | coming soon |
Owner / operator
Operator: Lavio Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Lavio Solar, LLC | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Ellis Creek Solar | 4 MW | 8.4 km |
| Waste Mangement Redwood LFGTE | 4 MW | 9.4 km |
| Silveira Ranch Road Solar | 3 MW | 9.7 km |
| Bodega Avenue Solar LLC | 2 MW | 9.8 km |
| Stage Gulch Solar | 1 MW | 10.8 km |
| Cottonwood Solar, LLC Cottonwood Carport | 1 MW | 11 km |