Camilla Solar Energy Project

Mitchell County, Georgia · EIA plant ID 61785 · Operator: Invenergy Services LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate171MWSummer 171 MW
Generators1in service
Net generation346GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202723.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020334.724.3%—
2021369.824.6%—
2022372.524.8%—
2023336.922.4%—
2024356.923.7%—
2025357.623.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CAMSRSolar PhotovoltaicPV171.4171.4Feb 2020Operating—coming soon

Owner / operator

Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Invenergy Services LLC100.0%171 MW

Nearby plants

Within 80 km.
Hickory Park Solar Hybrid236 MW5 km
Peach Wood Solar—8.4 km
OE_GA358 MW11.2 km
Camilla Solar Plant16 MW13.2 km
Sowega Power100 MW19.2 km
Baconton Power Plant121 MW19.2 km