← Back to map

Baconton Power Plant

Mitchell County, Georgia · EIA plant ID 55304 · Operator: Baconton Power LLC
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelBA: SOCO

×121 MW natural gas retired since 2020 (latest Jan 2023)

Nameplate121MWSummer 95 MW
Generators2in service
Net generation78GWh12 mo to Dec 2025
Capacity factor9%gas/coal/oil units, summer MW
Heat rate9,940Btu/kWhfossil units, electric fuel, HHV
First online2000Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%200520102015202020259.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,00010,00012,00014,000200520102015202020259,940 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200169.84.1%9,565
2002123.77.2%9,513
200333.62.0%9,166
20041.50.1%9,719
200515.70.9%9,774
200624.91.5%9,705
200732.71.9%9,693
20087.50.4%9,805
2009106.66.2%9,493
2010218.412.8%9,675
2011199.111.6%9,775
2012202.611.8%9,662
2013107.26.2%9,699
201431.41.8%9,684
201514.20.8%9,777
201671.94.2%9,881
20170.10.0%14,173
201867.63.9%9,482
2019248.814.5%9,702
20201508.7%9,644
2021200.411.7%9,512
2022151.78.8%9,577
202336.22.1%10,217
2024748.9%10,120
202577.69.3%9,940

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo11,437 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas91
Net summer MW on oil90
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CT1Natural Gas Fired Combustion TurbineGT60.548Jun 2000Operating—coming soon
CT5Natural Gas Fired Combustion TurbineGT60.547Jul 2000Operating—coming soon
CT4Natural Gas Fired Combustion TurbineGT60.549Jul 2000Retired Jan 2023—coming soon
CT6Natural Gas Fired Combustion TurbineGT60.549Aug 2000Retired Jan 2023—coming soon

Owner / operator

Operator: Baconton Power LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Sowega Energy Resources LLC50.0%61 MW
Oglethorpe Power Corporation25.0%30 MW
Georgia Energy Cooperative25.0%30 MW

Nearby plants

Within 80 km.
Sowega Power100 MW0 km
Peach Wood Solar—13.5 km
Dougherty County Solar, LLC120 MW14.3 km
Hickory Park Solar Hybrid236 MW15.9 km
MCLB Landfill Gas to Energy4 MW17.7 km
MCLB Biosteam to Energy9 MW18.8 km